Progress Report for the month of January 2016

Date:
11.02.2016

Government of Goa
Department of Tourism
Paryatan Bhavan
Patto, Panaji-Goa
Ph. 0832 2494200, 2494211   Fax: 0832-2494227

Email: dir-tour.goa@nic.in /deptgoatourism@gmail.com          Web: www.goatourism.gov.in

Kind Attn: Dr. N. Radhakrishnan                                   Fax: 2451243

 
Progress Report for the month of January 2016.     
1.       The following are the details/status of tourism infrastructure projects carried out by the Department through GTDC.
 
Sr.
No.
Name of Works Progress/ Status in %
1 Development of Boat Cruise, Parking in Panaji Sub Head: Construction of Multi-Level Car Parking 90%
2 Proposed Baga Beach Tourism Destination Development 80%
3 Construction of State Institute of Hotel Management & Catering Technology at Farmagudi Ponda-Goa. 25%
4 Providing and fixing Cast Iron, Stainless steel, and FRP benches at various locations  all over Goa 85%
5 Beautification & Illumination  of Church of Our Lady of Succour Work Completed.
6 Development of Mayem Lake Boating Side, Bicholim Goa 45%
7 Repairs and maintainance of High Mast Lights and other Public lightings   at Various places in the State (10 locations)
a) Repairs of Highmast at Uttorda,Majorda & Bogmalo Beach. Work Completed.
b) Repairing, Servicing, Testing and Commissioning of Facade illumination on outer periphery of St. Alex Church Curtorim Salcete Goa 30%
c) Repairs of existing 30 mts. High Mast by replacing 1000W SV Luminaries  with 2X400 W luminaries at Palolem Beach Work Completed.
d) Repairs and Maintenance of Highmast at Chicalim road junction, Betalbatim (near primary school and panchayat), Nr. Shantadurga fatorpa,Benaulim Beach,shiroda Bazzar & Fatorda near swimming pool. Work Completed.
8 Upgradation/Beautification of Tourist places in Quepem Taluka.
  a) Beautification of Traffic Roundabout & roads with pathways at Ambedkar Circle, Curchorem Goa 60%
b) Beautification of Traffic Roundabout & roads with pathways at Shivaji Circle, Curchorem Goa 10%
c) Beautification of road from Ambedkar Circle to Shivaji Circle with pathways and Construction of Toilet block near Library Building at Curchorem Goa. 30%
d) Beautification of Traffic Roundabout & roads with pathways at  Tilamol Circle and Illumination of  Tilamol Circle, Shivaji Circle and Ambedkar Circle - Curchorem Goa tendered

 
9 Renovation and upgradation spring tunnels and surrounding areas at Boca-de-Vaca, at Panaji Goa. 25%
10 Installation of High Mast Lights
a)  Illumination of Temple of Shree Devi Sateri at Hasapur, Pernem Goa. Work Completed.
11 Miscellaneous Works
  a)   AMC for 200KVa Diesel Generator set installed at Paryatan Bhavan, Patto-Plaza 80%
b)  AMC for 02 nos. . 08 Passenger lift of Thyssenkrupp make installed at Paryatan Bhavan, Patto-Plaza 80%
c)   Installation of Water tanks and flooring to toilet and Internal Electrification for the toilet at Calangute, Bardez Goa. 80%
12 Tourism Infrastructure Development for Colva Coastal Circuit, South Goa. 5%
13 Upgradation  & Renovation of Panaji Residency at Panaji Goa & Interior Furniture & Allied Works 95%
14 Providing Housekeeping & Allied Services (Facility Management) at Paryatan Bhavan 30%
15 Integrated Coastal Circuit Development in Pernem Taluka
 
 
 
 
 
 
 
a) Improvement to road connectivity from Siolim bridge to Chopdem Junction for tourism destinations for Morjim and Harmal beaches in Pernem Circuit and providing illumination and  general improvements tendered
b) Development of Morjim Khind, Morjim. tendered
c) Development of Morjai Temple, Morjim. WO issued
d) Ashvem Beach Parking. Ashvem, Goa. tendered
e) Beautifiction of Roadway pathways and illuminations  from Harmal Titto in Harmal Village to Bhumika Middle school at Palye along 'MDR-18' submitted for AA
g) Development of Property at Anjuna tendered
h) Construction of Changing rooms and Toilets on tourism departments land at Candolim Beach tendered
i) Profile correction and improvement of road from O'Coqueiro circle to Ambrekarnath Temple including Illumination on Right handside of the road. Sent for EFC approval
16 Developement of Vasco city & Beautification of Baina Beach. WO to be issued
17 Hot Air Balloon Operation Started.
18 Sea Planes Yet to start
19 Segway Tours Yet to start
20 Motorised Paragliding Yet to start
21 Amphibious Vessel Yet to start
22 Hop Off Hop On Buses Yet to start
       
 
2.       There is lot of demand for skilled and unskilled manpower in hotel industry, however due to lack of Institutes in training them, the Government could not cater to the needs of hotel industry therefore Government has taken the project of    Second Institute of Hotel Management & Catering Technology at Farmagudi in collaboration with Ministry of Tourism, Government of India, New Delhi and Phase I- comprising of main building has been tendered and work has been started at Farmagudi. About 25% work has been completed.
 
3.       Government has administratively approved & financially sanctioned the following works:-
i)     Work of supply, erection, testing & commissioning of 02 nos. of 20 mtrs. H.M.L. and 10 nos.of Blenhelm Poles with Keselec Luminaries at the Baina Beach.
 
4.           The work of development, deployment, management, and operation of Water Safety Patrol almost throughout the coastline with State of Art facilities in the coastal waters of the State of Goa on turn key basis is in operation through M/s Drishti Lifesaving Pvt. Ltd, Donapaula.
 
5.           Patrolling on the beaches is being carried out by the IRB Police personnel deployed on the beaches of Goa.
 
6.           Single Window System
Department has granted permission to 28 minor events and 02 major events under Single Window system and total revenue of Rs.2,03,74,000/- has been collected for a period from 25/12/2015 to 24/1/2016.
7.           Beach Cleaning:The work of “Comprehensive Management of Cleanliness” is in operation through M/s Bhumika Cleantech Services Pvt. Ltd. and M/s Ram Cleansers & Developers Pvt. Ltd., on the beaches of Goa” for North Goa and South Goa, respectively. The total contract period is for five years, renewed after 15 months if the Monitoring Committee members are satisfied with the work of the contractors. The Contractor completed 15 months on 7/12/2015.
 
i)Orders are issued to a batch of eight Information Assistantsof this Departmentto carry out weekly inspections of the beach stretches assigned to them from time to time.ii) Order is issued to all the Assistant Tourist Officers of the Department, to carry out weekly beach inspections. iii) Order is issued to Asstt. Directors to carry out beach inspections fortnightly.iv) Intensive daily inspections of beach stretches of North & South Goa are being carried out by the Officials vis-à-vis Information Assistant and Supervisor of this Department.
 
The said contract has completed 15 months on 7/12/2015; therefore, a detailed note is processed to Government for decision regarding extending the said beach cleaning contract.
 
8.           River Princess:
After seeking Administrative Approval and legal opinion of Ld. AG regarding issuing completion certificate to the contractor M/s Arihant Ship Breakers and regarding releasing the Bank Guarantee amounting to `10.00 crores deposited by the contractor with the Department of Tourism may please be perused.
On 18/11/2015; the Monitoring Committee constituted by the Government, issued Completion Certificate to the contractor and thereafter the Performance Bank Guarantee amounting to `10.00 crores was released.
The details of the Invoices submitted by the Contractor are:
a)     Invoice for an amount of `111,23,64,000/- (Rupees hundred and eleven crores twenty three lakhs sixty four thousand Only) including of all taxes towards the bid amount as per the Agreement (ie. towards the cutting and removing the vessel M.V. “River Princess”).
b)    Invoice towards plot rent to Samraat Marine Services, Goa on behalf of the Government amounting to `4,87,64,240/-.
c)     The contractor has raised an invoice amounting to `52,38,62,970/- (Rupees Fifty two crores thirty eight lakhs sixty two thousand nine hundred and seventy only) towards extra salvage of material as represented and warranted by Government of Goa.
d)    An amount of `3,18,54,601/- (Rupees three crores eighteen lakhs fifty four thousand six hundred and one only) towards demurrage incurred due to non availability of landing site to be provided by Government.
 
In this regard, a detailed note is processed to the Government for appropriate decision with respect to release of payment towards the above invoices/bills.
With regard to the payment towards the cutting and removing the vessel M.V. “River Princess” amounting to `111,23,64,000/-, Further, Government has partly approved releasing `84.00crores in 12 installments of `7.00 crores each during this Financial year 2015-2016; accordingly bills towards the payment of `84.00crores have been submitted to the Directorate of Accounts.
Beach Shacks:The work of distribution of licenses for Beach Shack has already been completed. 10 pairs of deck beds are been permitted to the Shack owners in the Government property after payment of requisite fees. Permissions are issued to unemployed youths for placement of deck beds/umbrellas on the beaches who had past experience after payment of requisite fees as per the policy 2013-16. Issue of licenses for hoteliers for placement of deck beds/umbrellas as per the policy 2013-16 are in process
9.       The Department has carried out the following trade activities:
Sr. no. Name of the Activity New Registration Renewal
1. Hotels/Guest Houses 9 32
2. Travel Agencies         3 4
3. Tourist Taxis 35 496
4. Water Sports Boats 3 7
 
 
 
 
 
 
 
10.    A large number of tourists domestic as well as foreign have             continued to visit the State during the month of January 2016.
**************